Start or Transfer Service

New Service Setup

To have utility service turned on, you must submit an application. Applications may be completed online or in person with the BPW Customer Service Department at our Gaffney office.

Applications are accepted Monday through Thursday, 7:00 AM to 5:00 PM, excluding holidays.

Select an Application

Choose the option that best matches the service you need.

Residential Service

Apply to establish utility service for a house, apartment or other residential property.

Residential Application

Commercial or Industrial Service

Apply to establish utility service for a business, commercial facility or industrial property.

Commercial Application

Transfer Existing Service

Request to move an existing BPW utility account from one service address to another.

Transfer Application

Fees & Rates

Deposit Schedule

Account Type Deposit
Residential Homes with Gas (Confirmation Required) $175
Residential All-Electric Home $250
Residential Water $100
Commercial/Industrial Accounts: Existing property — average of prior 12 months, doubled. New property — staff will calculate best estimate of a monthly bill, then double.  

Electric Connection Charges

Type of Build Inside City Outside City
Residential $1,000 $2,000
Commercial/Industrial Call for pricing Call for pricing

* This fee applies to customers building a new home or commercial business in BPW's electric service area.

Water Connection Charges

Size Inside City Outside City
3/4 inch Service $2,000 $3,000
1 inch Service $3,000 $5,000
2 inch Service * $9,000 $14,500
4 inch Service * $28,000 $44,000
6 inch Service * $55,000 $88,000
8 inch Service * $82,500 $132,000
10 inch Service * Call for pricing
12 inch Service * Call for pricing

* Customer to furnish meter pit built to BPW specifications.

Sewer Connection Charges

Size (Based on Water Service Size) Inside City Outside City
3/4 inch Service $2,000 $3,000
1 inch Service $4,200 $9,000
2 inch Service $13,500 $27,000
4 inch Service $60,000 $120,000
6 inch Service $180,000 $270,000
8 inch Service $240,000 $360,000

* Connection charges do not include encasement pipe or asphalt overlays. Actual cost of encasement pipe or asphalt overlay will be added when required by SCDOT.

Note: Includes $25.00 Inspection Fee. Backflow provided and paid for by the customer.

Approved and Implemented March 18, 2025

Water Meter Size ERU* Water Impact Fee Sewer Impact Fee
3/4" 1.0 $1,000 $4,000
1" 2.5 $2,500 $10,000
1-1/2" 5.0 $5,000 $20,000
2" 8.0 $8,000 $32,000
3" 16.0 $16,000 $64,000
4" 25.0 $25,000 $100,000
6" 50.0 $50,000 $200,000
8" 80.0 $80,000 $320,000
10" 115.0 $115,000 $460,000

* One Equivalent Residential Unit (ERU) assumes usage of 300 gallons per day.

Impact Fee Payment Rules

  • Single residential water and/or sewer service connection — Impact Fee will be paid on or before the payment of Connection Fees.
  • Residential Development — Sewer Impact Fees for all anticipated development must be paid prior to submittal of a Permit to Construct. Water Impact Fees must be paid on or before payment of Connection Fees.
  • Commercial/Industrial Connections (10 inch or less): All sewer Impact Fees must be paid prior to submittal of a Permit to Construct; water Impact Fees on or before Connection Fees.
  • Commercial/Industrial Connections (greater than 10 inch): Same rules apply; fees are based on daily demands from the design engineer. Adjustments made after one year of operation if actual demands differ from estimates.
  • Fire Suppression System Connection — No Impact Fees for metered fire suppression-only connections. A separate fire-only meter is required.
  • Payment of all applicable Impact Fees is a condition of development approval by BPW.
Delegated Review Program

Residential Development

  • Less than 100 lots — $1,000.00
  • 100 to 300 lots — $1,250.00
  • Over 300 lots — $1,750.00
  • Pump Station — $2,000.00

Commercial Development

$1,500.00

Septic Tank Disposal
  • Annual Applicant Permit: $250.00
  • Per 1,000 Gallons: $250.00
  • Industrial Pretreatment Annual Permit Fee: $2,500.00

Non-Payment Charges

All services subject to disconnection, penalty, and service interruption fee when full payment is not received by the due date.

  • Residential penalty: 5% ($5.00 min)
  • Commercial/Industrial penalty: 5% ($50.00 min)
  • Mon-Thu 7am-5pm reconnect: $50.00
  • Fri/Sat/Sun/Holidays 8am-5pm: $75.00
  • Reconnects not made between 5pm and 8am

Meter Tampering

All cases of meter tampering will be charged a minimum fee, plus reimbursement of all additional costs.

$250.00 minimum

Returned Check Fee

All returned checks will be charged a fee.

$30.00

Power Release Requirement

If electricity has not been connected at an address for more than 6 months, the customer must obtain a power release from the City of Gaffney or Cherokee County before BPW can reconnect service.

  • Bank Drafts
  • Cash
  • Check
  • Money Order
  • Credit Card (Visa, MasterCard, Discover)
  • Online (Visa, MasterCard)